Geometry Setups
| Tag | Date | Description | Author | Status | Last Modified | Download | Actions |
|---|
| run9_dev_26.09.08 | 2026-09-08 18:43 | Run9 revision derived from run9_dev_26.05.19. New Hodo geometry is used. Hgnd is in setup | nkarpush | Approved | 2026-09-09 21:39 | |
|
| run9_dev_26.05.19 | 2026-05-19 03:13 | Run9 develop setup. Vacuum beam pipe updated. Overlap problems fixed. | dbaranov | Approved | 2026-05-19 03:25 | |
|
| run9_dev_26.04.07 | 2026-04-07 12:52 | Run9 revision derived from run9_26.02.0 with ndet prototype with vacuum envelope | nkarpush | Approved | 2026-04-09 11:57 | |
|
| run9_dev_25.10.12 | 2025-10-13 17:22 | Run9 develop setup from git 12.10.2025 | aleksand | Approved | 2025-10-14 08:44 | |
|
| run9_26.10.0 | 2026-10-07 16:43 | the current geometry for production 26.10 | gertsen | Approved | 2026-10-07 19:19 | |
|
| run9_26.09.0 | 2026-09-14 14:57 | Lalyo corrections to TOF700 (26.09) | gertsen | Approved | 2026-09-14 14:59 | |
|
| run9_26.02.0 | 2026-02-27 10:07 | Run9 revision 26.02.0. It has problem with overlap. | aleksand | Approved | 2026-02-27 10:08 | |
|
| run8_dev_25.11.01 | 2025-11-01 11:20 | run8 for branch dev from 01/11/2025. Geometry of Hodo detector shifted by 6 mm along the x-axis. | aleksand | Approved | 2025-11-01 12:10 | |
|
| run8_dev_25.05.12 | 2025-05-12 16:20 | run8 for branch dev from 12/05/2025 | aleksand | Approved | 2025-05-12 16:21 | |
|
| run8_25.09.0 | 2025-09-28 21:53 | run8 for branch 25.09.0 | aleksand | Approved | 2025-10-06 11:57 | |
|
| run8_25.04.0 | 2025-05-12 12:25 | run8 for branch 25.04.0 | aleksand | Approved | 2025-05-12 16:23 | |
|
| run8_24.12.0 | 2025-05-07 18:07 | run8 for branch 24.12.0 | aleksand | Approved | 2025-05-12 12:49 | |
|